Penetrating.
THE SWITCHRAIL SOLUTION: UNMATCHED STRENGTH, LASTING PEACE OF MIND




Penetrating System
Here’s the new SwitchRail “way” and the “old way” (stick built 2×4 railing discarded to the right). Our configuration was installed in approximately 10 minutes by drilling eight (8) holes for 3/8″ Red Head self threading anchors. That’s 7 components, 8 anchors, one hammer drill and… DONE!
It will take your crew longer to get the material to the job site than it will to install these rails!
Anchored System Examples
SwitchRail has become a big part of our safety program. The ease of use and the flexibility with their various systems make it a no brainer to use.
Step-by-step assembly
1) Lay out base plates (6” x 9” or 3” x 9” base plates)
2) Install rail sections
3) Make sure decals face work area
4) Hand-tighten locking devices
5) Drill 5/16” pilot holes in slots on base plates
6) Use an impact with 9/16” socket to install anchor screws
Explore Our Product Range

DSBP2 - Double Stem Base Plate

EBP - End Base Plate

DSCRP - Double Stem Corner Plate

SRP8 - SwitchRail Panel 8 Foot

SG3 - Swing Gate 2' to 3'

SG5 - Swing Gate 3' to 5'

SRT - SwitchRail Tubing

SRP42 - SwitchRail Post - 42"

