Walsh AMLI 101.JPG

ANCHORED System

Here’s the new SwitchRail “way” and the “old way” (stick built 2×4 railing discarded to the right). Our configuration was installed in approximately 10 minutes by drilling eight (8) holes for 3/8″ Red Head self threading anchors. That’s 7 components, 8 anchors, one hammer drill and…DONE!

 

 

It will take your crew longer to get the material to the job site than it will to install these rails!


ANCHORED System EXAMPLES

If this system was available 20 years ago, I would have been able to extend my working career in the field.
— Woody H. (Field Worker)