ANCHORED System
Here’s the new SwitchRail “way” and the “old way” (stick built 2×4 railing discarded to the right). Our configuration was installed in approximately 10 minutes by drilling eight (8) holes for 3/8″ Red Head self threading anchors. That’s 7 components, 8 anchors, one hammer drill and…DONE!
It will take your crew longer to get the material to the job site than it will to install these rails!